  1. Environmental Sensitivity Index Mapping (ESI) of Nigeria’s outer coastline.
  2. Environmental Impact Assessments for Exploratory Drilling (various companies) (Mobil, Esso, Agip, Conoco, Elf, Satoil  and others).
  3. Compliance Monitoring of Flow Stations and Gas Plants for Shell Petroleum Development Company (SPDC) (W) (1996, 97, 98).
  4. Environmental Impact Assessment, Risk Analysis and Hazard Assessment for Texaco Nigeria Plc.
  5. Environmental Post Impact Assessment (EPIA) of the Oil Spill at Utonana.
  6. Environmental Impact Assessment for Allied Energy Resources Nigeria Limited.
  7. Remediation of Niger Delta Environmental Survey (NDES) Preliminary Report – Phase 1.
  8. Development of A Biodegradation Protocol for Nigeria, for the Department of Petroleum Resources (DPR).
  9. Onsite technical support following the Mobil Oil Spill of 12 January 1998.
  10. Environmental Monitoring of Gaseous Emissions in 6 Swamp Flare Sites for Shell Petroleum Development Company of Nigeria (SPDC) Western Division.
  11. Environmental Evaluation of Escravos Tank Farm for Chevron Nigeria Limited.
  12. Environmental Impact Assessment of Bonga Field Development for SNEPCO Limited.
  13. Environmental Evaluation Study of Chevron Group IV Offshore Locations.
  14. Environmental Sensitivity Index (ESI) Mapping for Texaco Overseas Petroleum Company of Nigeria (TOPCON).
  15. Implementation of GIS and Remote Sensing in SPDC HSE-ENV.
  16. Mangrove Restoration in the Niger Delta FOR Chevron Nigeria Limited.
  17. Environmental Impact Assessment of the Barge Project at Egbin (BPE) for Enron Barge Nigeria Limited.
  18. ESI Standards and Protocols Development Project for the Oil Producers Trade Section of the Lagos Chamber of Commerce (OPTS).
  19. Environmental Impact Assessment of Escravos Gas to Liquid (EGTL) Project for Chevron Nigeria Limited.
  20. Environmental Impact Assessment of Escravos Gas Plant Phase 3 (EGP3) for Chevron Nigeria Limited.
  21. Environmental Impact Assessment of West African Gas Pipeline (WAGP) Project for Chevron Nigeria Limited.
  22. Risk Assessment of Abiteye Slipway for Chevron Nigeria Limited.
  23. Supply, Installation and Training on Oil Spill Response Equipment for SPDC.
  24. Hydrography and Bathymetry Survey for Chevron Nigeria Limited.
  25. Development of Waste Management Plan for Star Deepwater Limited.
  26. Baseline studies for Flowstation in Tuomo, Delta State.
  27. Environmental Due Diligence Study  for Texaco Nigeria Limited.
  28. Baseline studies for Flowstation in Tuomo, Delta State.
  29. Environmental, Social and Health Impact Assessment for the Brass LNG Project (onshore and offshore components).
  30. Environmental Due diligence for the Brass LNG Project.
  31. Environmental Impact Assessment for 6 marginal fields development in Niger Delta.
  32. Environmental Impact Assessments of the Ovade/Ogharefe Field for the Pan Ocean Oil Corporation.
  33. Environmental Due Diligence Study  for Texaco Nigeria Limted.
  34. Land Farming of Drill Cuttings for the Escravos  Gas to Liquid Project.
  35. Environmental Impact Assessment and Environmental Evaluation Studies of sites in Lagos State and the South Western Region of Nigeria for VEE Networks Limited Sites in Nigeria.
  36. Environmental Impact Assessment for Oza marginal field development in Abia State.
  37. Provision of offshore vessel for Environmental Monitoring in 3 SNEPCO Deepwater Blocks.
  38. Ambient Noise Studies for the Brass LNG Project.
  39. Geographic Information System (GIS) Implementation for VNL in Nigeria.
  40. ESI Mapping  and GIS Environmental Database for SNEPCO.
  41. Environmental Impact Assessment of Deepwater Bonga North 3 Appraisal Well for SNEPCO.
  42. Environmental Assessment and Opinion on Eko Atlantic City Project for First Bank Nigeria PLC.
  43. Environmental Impact Assessment Addendum for the West African Gas Pipeline (WAGP) Project.
  44. Provision of vessel and personnel for Environmental Monitoring in SNEPCO Deepwater Blocks 219, 245 and 322.
  45. Ecological Baseline Survey for  Aje 4 Apprasial Drilling Programme for Star Deep/Yinka Folawiyo.
  46. Ecological Seabed Survey and Environmental Impact Assessment for Ebok Field Development in shallow waters offshore Cross River.
  47. Environmental and Social Management Framework for Infrastructure Concession and Regulatory Commission (ICRC).
  48. Environmental Impact Assessment for Ajapa marginal field development in Offshore Delta State.
  49. Environmental and Social Management Framework for World Bank/Infrastructure Concession and Regulatory Commission of Nigeria.
  50. Specialist Opinion on Environmental and Social Issues associated with the Eko Atlantic Project.
  51. Block wide Ecological Seabed Survey of Deepwater Blocks OPL Blocks 321 and 323 for Korean National Oil Company (KNOC).
  52. Environmental Due Diligence for African Foundries (Ikorodu).
  53. Environmental Monitoring for Construction Activities of the West African Gas Pipeline Company in Lagos, Benin, Togo and Ghana.
  54. Environmental and Social Management Framework for the ACE Cable Project in Liberia.
  55. Environmental Due Diligence Studies of OML 26 in Delta State for First Hydrocarbon.
  56. Environmental Due Diligence Studies of OML 40 in Delta State for Vertex Energy.
  57. Environmental Due Diligence of OML 34 in Delta State for Neconde Energy Limited.
  58. Environmental and Social Due Diligence and Advisory for various Investments
  59. Environmental Impact Assessment of the Aje Field Development Project Offshore Nigeria.
  60. Post Drill Seabed Survey in Okoro Field for AMNI International Petroleum Development Company.
  61. Environmental Impact Assessment of the Ikot Abasi Power Plant.
  62. Environmental, Social and Health Impact Assessment for the Olokola LNG Project (onshore and offshore components)
  63. Environmental Impact Assessment of the Greater Port Harcourt City Development Project (Phase 1A)
  64. Environmental Impact Assessment (Update 2) of the Brass LNG Project (Onshore and Offshore)
  65. Environmental Impact Assessment of the Okoro Offshore Further Field Development Project for AMNI Petroleum
  66. Environmental Impact Assessment of AES Barge Nigeria Limited Power Plant Refurbishment and Expansion Project

ONGOING PROJECTS

ONGOING PROJECTS/PROGRAMMES/STUDIES
  1. Long-term Air Quality Monitoring for the Chevron Nigeria Limited operation in Western Niger Delta.
  2. Environmental Advisory Services for all African Capital Alliance on IFC funded Projects
  3. Environmental Advisory Services for Advance Finance Investment Group (Senegal) projects
  4. Environmental Impact Assessment of the Udele/Ofrima Field Development Programme Offshore Nigeria for Addax Petroleum
  5. Environmental Social Risk Management Advisory Services for Fidelity Bank of Nigeria
  6. Technical Evaluation of Produced Water Handling Options for Okoro Field, for AMNI Petroleum

Biophysical Environment

ERML is extensively and intimately involved in the implementation and monitoring of environmental management and social programmes...

Socio-Cultural Environment

Since the mid 1990s members of the ERML team have been involved in a number of socio economic and related studies and programmes...

Training

We are also involved in capacity building on HSE matters for its clients. Some training programmes organized by ERML or which we provided resource persons...